Product Search
Home > Service > Technical service Technical service

Six Systems Ensuring Final Quality Goals 

1. Design
All valves are designed to comply with the requirements of DIN, ANSI, BS, JIS and specials to customer requirements as applicable.

2. Quality Assurance
Every step from procurement through production, welding, assembly, testing, and packaging is in accordance with written rules contained QA manuals. Our plants are certified to ISO 9001-2000. Orders are reviewed by Engineering and QA Departments and all special customer requirements are incorporated into quality control instructions (QCI) issued for each project. The QA Department also operates calibration and gauge control systems.

3. Quality Control
The QC Department is responsible for all aspects of quality, from receiving of material to control of machining processes, welding, nondestructive testing, assembly, pressure testing, cleaning, painting, and packaging. When required, a permanent record of all completed quality goals is prepared and sent to customers.

4. Pressure Testing
Each valve is pressure tested in accordance with DIN, ANSI, BS, JIS or special customer requirements as applicable. In all plants test status is integrated into production control/inventory management software.

5. Improvement Teams
Continuous improvement teams at point of manufacturing ensure quality at source, process control, higher workmanship, and operator ownership.

6. Qualification Testing
Reliability is ensured through functional qualification tests. These tests are performed on all valves to determine reliability and service life.



 

Picture Name Picture Name Picture Name
Picture Name Picture Name Picture Name
     
   
 
copyright 2008 fangxing industrial co.,ltd All rights reserved.
+86-566-5115556    +86-566-5115558    fxfzs@fxgvp.com
ICP备06002600